itelm

Electrical

Inspections and tests of electrical equipment to Slovak standards (STN) and turn-key electrical installations. We sign the report on site and send it to you by link.

Services

Who we inspect for

What you get

How an inspection works

  1. Agree a date

    We ask about the building and equipment, agree a date and tell you what to prepare.

  2. Inspection and measurements

    On site we carry out the inspection and tests, measurements and a documentation check.

  3. Inspection report

    We prepare a report to STN with findings and recommendations, and sign it.

  4. Next date

    The next inspection date goes into the report, and we remind you before it.

Standards we work to

  • STN 33 1500
  • STN 33 2000
  • STN EN 62305
  • STN EN 62446-1
  • STN 33 1630
  • STN EN 50699

Frequently asked questions

How often is an inspection needed?

Intervals are set by regulations and standards depending on the type of premises and equipment. We state the next date in the report and remind you before it.

What should I prepare?

Access to distribution boards and the equipment being inspected, project documentation if you have it, and the previous inspection report.

When do I get the report?

The signed report is handed over digitally, by link or QR code. For larger buildings, once all measurements are processed.

What if the inspection finds defects?

The report describes the defects found and our recommendations. We can arrange the repairs and then re-check.

Need an inspection?

Send us the type of building and the address. We will reply within one working day with a date and price.